![]() ![]() Clearly, the technology is established in modern AEC workflows. The mobile phone isn’t just a tool for democratization, it’s the ultimate mediator as workers on-site can show the designers what’s not working and owners can bring all sides to the virtual table to understand what’s really going on.Ĭurrent estimates put BIM use at close to saturation in large construction companies, around 70% in mid-range companies, and limited in small companies. The construction industry has demanded to be part of the information flow. ![]() Probably nothing has done more to bring BIM to the AEC industry top to bottom than the presence of a mobile phone in every pocket and on every site. It’s not easy to pin down the first BIM mandates, but the UK usually gets credit for Digital Built Britain in 2011, which called for Level 2 BIM compliance on all public sector projects by 2016. The technology got a leg up from European government bodies, which had been calling for established standards and data management for large projects. BIM has been around as a concept since the 1980s and began to gain regulatory traction in the 2000s. Once a slow-growing luxury for large construction firms, BIM is now accepted as a requirement on large projects. The acceptance of BIM through the last decade has been astonishing. Finding the right fit employers may not always be satisfied with the pool of new recruits but they’re searching for young employees and understand the need for ongoing training. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |